🇹🇷Artvin
Completed
Installed Capacity24.85 MW
Generation Capacity116 GWh
A 22.85 MW hydroelectric power plant project in Artvin.
For the Otluca II HPP project, the powerhouse and switchyard were constructed in Artvin’s challenging geography using modern engineering methods. Following the main construction works, mechanical and electromechanical installations were completed and the plant was successfully commissioned for electricity generation.