🇹🇷Artvin
Completed
Installed Capacity24.85 MW
Generation Capacity116 GWh
A 14.00 MW hydroelectric energy project in Artvin.
At Köprübaşı HPP, extensive infrastructure works were carried out using environmentally conscious construction methods. Following reinforced-concrete works, durable electromechanical equipment was installed and the plant was brought into sustainable energy production.