🇹🇷Artvin
Completed
Installed Capacity24.85 MW
Generation Capacity116 GWh
An 18.00 MW hydroelectric power project in Artvin.
Kayaköprü I HPP was delivered in Artvin as part of a renewable energy development vision. Construction and electromechanical works were completed with attention to environmental considerations and high technical standards, contributing lasting clean-energy generation capacity to the region.