🇹🇷Artvin
Completed
Installed Capacity24.85 MW
Generation Capacity116 GWh
A 10.00 MW hydroelectric energy investment in Artvin.
Kayaköprü II HPP was developed to make efficient use of the river’s hydraulic potential. Extensive excavation, reinforced concrete and steel structure works, together with precision turbine installations, were completed to the required quality standards and the plant was prepared for power generation.