🇹🇷Artvin
Completed
Installed Capacity24.85 MW
Generation Capacity116 GWh
More than 100 km of 154 kV and 34.5 kV power transmission infrastructure.
The Power Transmission Lines project included the construction of more than 100 kilometres of 154 kV and 34.5 kV transmission lines. Engineering, procurement and implementation activities were managed as an integrated process, with switchyard connections and substations incorporated into the system.